Project Background

The Ontario Ministry of Transportation (MTO) and Infrastructure Ontario (IO) retained GIP Hwy 3 Inc. (GIP) to complete the Design-Build-Finance (DBF) contract for the Class Environmental Assessment (EA), Detail Design, and Construction for the widening of Highway 3 from 1.2 km east of Essex Road 23 easterly to 1.1 km east of Essex Road 34. 

Temp_edited.jpg

PROJECT HISTORY

Preliminary Design and Class EA
- documented in a Transportation Environmental Study Report (TESR)

CONTRACT 1

Preliminary Design, Initial Detailed Design and Class EA

Detailed Design, Class EA and Construction

September 2012 - November 2016

September 2020 - present

Transportation Environmental Study Report (TESR) Addendum

July 2021